February, 2011 Rich Technology won the bidding of Subway Line 2 project.
There are 19 stations on the first phase of Shenyang subway line 2, Shangshengou – Xiashengou - Century park-exhibition center-Wuli river-Young park-Young road-Municipal park-Financial park-Shenyang north station-Qishan road-Beiling park-Xinle memorial-Lingxi-Songshan road. The first phase of subway line 2 connects the main roads of north and south riverside and connects to passenger traffic terminal of Shenyang north station. The main function is reinforcing traffic connection between both sides of Hun River, improving the construction of Hunnan new district. It is also called by “Gold Porch Line” because that the main part of subway line 2 is in tandem with the gold porch of Shenyang with 18.8 Km of the complete length and 16stations.The line goes through the whole city from south north, south from Xian tao airport, north from Daoyi and through Hun river, gathering the most potential locations in Shenyang.
Subway line 2 project in Shenyang chooses our products, it makes sure the security of the subway also provides intelligent access management.