June, 2013 Rich Technology won the bidding of Chengdu BRT.
On 1th, June, 2013, Chengdu BRT was put into operation. The passenger flow of that day reached up to 292,000 people, which equals to the total volumn of 8 main roads or the average daily traffic of Line 2. Chengdu BRT has 28 pairs of stops, 22 pairs of which are standard stops designed as traffic islands with ground floor, station hall floor and platform floor. The average distance between each two stops is about 1 km. There is a special platform every 3 or 4 stops.
Chengdu BRT employs advanced AFC system with more than 260 passages, which not only guarantees the fare income, but also helps improve the passing efficiency. We enjoy a market share of 70% in national railway traffic industry, and a good professional reputation thanks to its excellent performance and maintain-free design.