Lanzhou subway line 1 starts from Shigang in Xigu District in the west to Donggangzhen in Chengguan District in the east of Lanzhou, with 24 stations and 34 km in total length, and the average station spacing is 1478m. For the first phase of subway line 1, it crosses the central city from Xigu District in the west to Chengguan District in the east, through Chengguan District, Qilihe District, Anning District and Xigu District. It will be the main rail transport line with 20 stations underground and 26km in total length, covering Chenguanying Station, Olympic Central Station, Century Avenue Station, Yingmentan Station, Matan Station, Tumendun Station, West Rail Station, West Rail Cross Station, Qilihe Station, Small West Lake Station, Cultural Palace Station, Xiguan Cross Station, Provincial Government Station, Dongfanghong Station, Panxuan Road Station, Wulipu Station, Eastern Market Station, Gongxingdun Station, Jiaojiawan Station and Donggang Station. With 1 rolling stock depot,1 parking lot, 2 main substation and 1 control central, the investment is about 19.8 billion.
Lanzhou subway line 1 is the main rail transport line across the central city, will relief the urban traffic pressure effectively and improve the environment.
With strong overall strength and brand influence, Rich Technology has won the bidding of Lanzhou Subway Line 1 projects, which will equipped with our turnstiles.