国产精品传媒麻豆中文字幕,亚洲一区|精品久久久久中文慕人妻日韩 欧美 字幕|久久精品亚洲一区二区三区画质亚洲国产成人久久一区|中文字幕不卡av国产精品91大神|亚洲精品一区二区三区中文字幕|国产精品久久亚洲|国产精品99久久久久久成人四虎|色综合久久精品|日本东京热中文字幕|亚洲人成色77777在线观看,,国产精品一二三四区免费,国产精品国产三级国产专不,中文字幕久久久久高清乱码

LATEST NEWSHome >
September 2017 Reach (Beijing) Technology Co., Ltd. won the bidding of Qingdao Metro line 2 project
發(fā)布時(shí)間:2019-12-18

Qingdao metro line 2 is a backbone link which connects with the Qingdao and Huang Island. At the same time, it connects with a series of large passenger hubs together, just as the Qingdao old city, administrative center, business center, eastern culture center and north life center. And through the transfer, it links up the rail transit 1, 3, 4, 5, 6, R1 and line 9.

The first phase of metro line 2 project starts at Taishan road. The line runs along Liaoning road and Taidong first road, and passes through Hisense overpass, and turns to the south along Yan 'an third road. After reaching Hong Kong road, the line goes east through municipal government, Ocean plaza, Xinjiazhuang, Maidao, Qingdao university and Beer city, and turns north to Shenzhen road. After passing Liaoyang east road station, the line goes north along the planned road into Zaoshan road. After passing Lee village, the line goes north along Xiazhuang road and reaches the Jinshui road.

The length of the first phase of metre line 2 is 25.203 KM, and there are 22 stations of the whole line, and the interchange station has nine, and they are respectively Taishan road station (transfer to the line 4), Guangzhou east station (transfer to the line 1), the May Fouth square station (transfer to the line 3), Yanerdao road station (transfer to the line 9), Wheat island station (transfer to the line 5 ), Southeast road station (transfer to the line R1 ), Liaoyang east road station (transfer to the line 4), DongHan station (transfer to the line 6), and Lee village station ( transfer to the line 3).

Our company has successfully provided more than 400 sets of shear doors for Qingdao metro line 2 project. The first phase of Qingdao metro line 2 will put into use in December 2017.