Shenyang metro line 9 is an important line of the two “L” lines in the recent construction planning. It starts from the northwest side of Nujiang park in the north, and form the north to the south, passes through Huanggu District, Tiexi district, Yuhong district, Heping district and Hunnan new district, and ends at Shimiaozi. The length of the line is 36.35km long and all the stations are underground.
There are 23 stations of this line from the starting point to Jianzhu university station, including 11 transfer stations and 12 general stations. The average distance between stations is about 1.282km. It sets up a car depot (repair section), 3 main substations (two of them are new) and share line 1 control center. After the extension of the forward line, there will be 5 stations and a parking lot.
After fierce competition, our company won the bid of Shenyang metro line 9 project.Our company will provide more than 500 sets of shear doors for it.