According to the requirements of the national laws and regulations on the physical protection system of nuclear power plants, it is necessary to build the physical protection system facilities of nuclear power plants and strengthen the operation security management of nuclear power plants, so as to ensure the stability, safety and economic operation of nuclear power plants. The physical protection system of Fangchenggang 3-4 unit nuclear power plant is designed for the effective detection, monitoring, alarm and delay of the invasion of the hostile groups or gangs, providing the necessary condition and guarantee to prevent and stop the threat and sabotage activities for invasion the nuclear power plants, providing a safe and reliable environment for the operation of the nuclear power plant.The physical protection system of unit 3-4 of Fangchenggang nuclear power plant is an expansion system, which shares the main entrance and exit of the control area with the first phase of the project and forms a complete control area through the fence of the control area. Unit 3-4 will build the main entrance and exit of the protection area and form a complete protection area with the fence of the second phase of the protection area.
Our company provides full-height turnstiles and tripods for the integrated management platform of physical protection system of Fangchenggang 3-4 unit nuclear power plant. The product design is simple and elegant, easy to operate, anti-tracking and high safety. The advanced induction system of full-height turnstiles to prevent unauthorized personnel from entering meets the needs of customers.Providing convenient, efficient and effective means for the normal operation of the factory access control system, the use of emergency exits, the operation of the entrances and exits of security personnel and emergency situations.