The first phase of Xuzhou metro line 3 is a auxiliary backbone line for north-south direction. For the north end, it starts at Xiadian station,and along the Xiadian road - Daqing road - Fuxing road - the Old yellow river - Huaita east road - Jiefang south road - Beijing road - Yangtze river west road - Huangshan road - Silver road line, and via to Xuzhou railway station, Huaihai plaza, University of mining, Tongshan new district, and end at the panning Anke park on the northern side of the highway planning. The total length of the first phase is about 18.3 kilometers and is expected to be completed and open in 2020.
The construction of Xuzhou metro line 3 expands the line network on the basis of the existing backbone track network, and strengthens the track connection between the "double-center" group and various peripheral groups. It encrypt the density and coverage of rail line network, and improve the service and level of rail transit; and it strengthen the connection between the main urban rail line network and the outer urban cluster; and it properly connect the rail network with urban rail transit in urban areas.
In February 2019, our company won the bid of Xuzhou metro line 3 project.