国产精品传媒麻豆中文字幕,亚洲一区|精品久久久久中文慕人妻日韩 欧美 字幕|久久精品亚洲一区二区三区画质亚洲国产成人久久一区|中文字幕不卡av国产精品91大神|亚洲精品一区二区三区中文字幕|国产精品久久亚洲|国产精品99久久久久久成人四虎|色综合久久精品|日本东京热中文字幕|亚洲人成色77777在线观看,,国产精品一二三四区免费,国产精品国产三级国产专不,中文字幕久久久久高清乱码

LATEST NEWSHome >
August 2020 Reach (Beijing) Technology Co., Ltd. won the bidding of Tianjin Metro line 6 West(Lushuidao Station ~ Xianshuigu West Station) project
發(fā)布時間:2021-02-23

The construction scale of Tianjin Metro Line 6 is 56.15 km.It starts from Dabizhuang in the north and ends at Jinqi Road in the south. The total length of the main line is 56.15 km, of which the underground line is 54.56 km, the elevated line is 1.326 km, and the transition section is 0.264 km.The connection line of Metro line 2 and line 6 is 0.34 km.There are 48 stations in total.

The Tianjin Metro Line 6 Project (Lushuidao Station ~ Xianshuigu West Station) consists of 11 stations (including 9 stations, 1 depot and 1 Control Center) , with a total length of 13.42 km. The main line starts from the planned Lushuidao station in Jinnan District in the north and is laid southward along Weishan Road, the Lower Outer Ring Road will continue to be laid south along Weishan Road and South Weishan County Road. The lower ring road will be laid West along Pawan Road and Tongyan road after the lower crossing of Ningjing expressway. The destination will be Xianshuigu West station at the intersection of Tsunan Avenue and No. 28 road. The long-term link with the proposed Tianjin Metro Line 8 will connect the two-port residential area on the outskirts of the city, the Hai River Education Park, the Xianshuigu and the outlying areas and the central urban area.

In August 2020, our company won the bidding for Tianjin Metro line 6 West(Lushuidao Station ~ Xianshuigu West Station) project.