Shenyang Metro Line 4 is the fifth metro line to be opened in Shenyang, Liaoning Province, China. In the online network of the first phase of the project, it belongs to the line running from northeast to southwest, passing through five administrative regions, namely Dadong District, Shenhe District, Heping District, Sujiatun District and Hunnan District.It is mainly laid along Wanghua North Street, Labor Road, Cooperative Street, United Road, North Station Road, Nanjing North Street, Nanjing South Street, Hongchun Road and second High speed railway Street.The full length of the first-phase engineering line is about 32.5km, all underground lines;There are 23 stations, all of which are underground island stations, 12 of which are transfer stations.
Shenyang Metro Line 4 is expected to start trial operation in December 2022 and open for initial operation in the first half of 2023.